Dublin Core
Title
Box 4, Folder 15, Document 51
Text Item Type Metadata
Text
METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY
GLENN BUILDING / ATLANTA, GEORGIA 30303 / AREA CODE 404 524-5711
June 17, 1969
Mr. Collier Gladin
Planning Director
City of Atlanta
Atlanta, Ga. 30303 .
Mr. Robert W. Bivens
Executive Director
Central Atlanta Progress
2740 First Nat'l Bank Bldg.
Atlanta, Ga. 30303
Mr. Leland Veal
Planning Engineer
State Highway Department
of Georgia, Inc.
No. 2 Capitol Square, S. W.
Atlanta, Ga. 30334
Gentlemen:
OFFICERS:
Richard H. Rich, Chairman
Roy A. Blount, Vice Chairman
Edmund W. Hughes, Secretary
Henry L. Stuart, General Manager
Mr. William W. Allison
Deputy Administrator
Economic Opportunity Atlanta, Inc.
101 Marietta Street Building
Atlanta, Ga. 30303
Mr. J. D. Wingfield, Jr.
Planning Director
Atlanta Region Metropolitan
Planning Commission
900 Glenn Building
Atlanta, Ga. 30303
Alan M. Voorhees and Associates, now under contract to
the State Highway Department, and indirectly under contract to MARTA,
and proposed as a consultant to the Central Atlanta Study and to
Economic Opportunity Atlanta,
is going to be in a position of work-
ing on transportation problems in Atlanta under several different
contracts for several different agencies.
We should be very care-
ful that we are not paying more money for any particular job under
the several contracts than we would have paid had there been but
one contract.
MARTA has had PBTB under multiple-contracts simultaneously
with the Atlanta Region Metropolitan Planning Commission, and our
Counsel arranged the following wording to cover the situation men-
tioned above in connection with Voorhees:
"It is recognized that a separate contract concerning
engineering for this same project exists between the
Authority and the Engineer (therein designated "Con-
tractor") and that, in addition, a contract exists
between the Atlanta Region Metropolitan Planning Com-
mission and the’Engineer (therein designated "Contrac-—
tor") for updating a previous planning study concerning
oo Free
the same project. Because of the inter-relationship
of the three contracts, the Engineer agrees it shall
report to the Authority its costs on each of these
contracts, computed on the reimbursement bases of
the terms of this Agreement, and Engineer further
agrees that the total compensation to the Engineer
under the three contracts shall be no more than that
which would obtain had the work all been performed
under the terms of this Agreement."
I refer this to you for review by your Legal Counsel.
Sincerely yours,
A L Aéiauk-
H. L. Stuart,
General Manager.
HLS :JJ
cc: Mr. Thomas B. Deen :
Alan M. Voorhees & Associates, Inc.
Mr. W. Stell Huie
Huie and Harland
Mr. J. A. Coil
, Parsons Brinckerhoff-Tudor-Bechtel