THOMASVILLE PARK , i aoe
BIDS SUBMITTED TO INCLUDE (Break bids down as listed below) .-
ror 2.
be
Cost for ail Incidental Work (AL1 labor, materials,
and ceulpment necessary to complete all miscel~
Laneous incidental items of work required by or
inferred from plans and specifications. Generally
includes incidental Gun EEBUGEIGn work, services,
bonds, permits, etc,, which cannot be allocated
properly to other sections of specifications
Total Cost $ 800.00
Cost fox Clearing, Grubbing and ppv”
‘Demolition Arrrox. 3.5 Aeres c Total Cost $§_ /4 40. 0O
Unit. Farce ONC Scr
Cost for Grading Includes Sabcut)
(2) Approximately 5,700 cu. yds.
nate and fill
Unit Price _@. 0.55 /eu. “yd Total Cost $___.3./35.00
(b) ‘Rock (1£ encountered)! - Jus a
‘Unit Price _/o** /cu.: yd. t Se ie
Cost for Storm Drainage ©”
(a) 3 Catch Basins ok é;
fe perce 22. pO: vert, ff. -._*" ae
Unit Price 40~ /vert. ft. Fotaly Cost pits ti 350.00
(b) sppeoninately 338 lin, £6. 15" ns Aen © -
concrete pipe ae
Unit Price @@ /lin, ft. Total Cost $ 2.028, 00
(c) Concrete Headwall (1) / - ‘Total Cost $_ 130.00
(a) Trench Rock (if Sancineased) “4
Unit Price 37,00/ cu. yd. Total Cost $
{e) Approximately 204 lin; fe. a" SR a :
perforated bell & spigot
drain tile
Unit Price 2.50 /lin. ft. Total Cost $ 3/0 00
Cost for Masonry Work
(a) Approximately 43 Perch
Masonry Walls
Unit Price 27 5fifPexch ' Total Cost $ //8 2.50
(b) Approximately 7 cu. yds.
conerete footing
Unit Price _33.70/ cu. yd. - Total Cost $ A le QO |
PROPOSAL 4.
BIDS SUBMITTED TO INCLUDE (Break bids down as
Rae S AL,
Cost
Cost
(a)
(b)
(c)
(a)
(b)
(c)
(d) 2 Service Gates -I/'6"x 10-0" (
for Masonry
_ el
luo
\ourx|
_fCont'd)
. CONSTRUCTION = TEOMASVILLE PARK
oximately 1,520 sq. ft.
granite rip-rap.
Gus
a:
Unit Price ft 40 /ous= rd ° (o
for Concrete Work
Approximately 2.000 lin, ft.
curb and gutter
Unit Price 2 PS Ilias Ets
Avproximatel Lins fe.
Aa tbe eee azound
Game Courts
Unit Price 2/5 LIS Misi ft.
walk and curb 1 |
0.68 /sq. ft.
Apr
comb,
Unit Price
Approximately 2.288 288 Sq: ft, plain
walk
Unit FE
Price 0.48 Jea. ft.
Approximately 286 lin. ft. steps
__G.r0/lin, Et.
Unit Price
Approximately 54 lin. ‘fe,
reinforced conerete wall .
Unit Price G&7 75 /1in. £t.%
4, Concrete Apron
(City of Atlanta)
for Fencing
Approximately 717 a ‘ ft.
10’ fence Ge gauge) .
Unit Price _3.9/ Jlin. Ets
eel Fabric Gates ‘=
7' Pad Lockable |
Price £5 07 /eate
23
3°
mao
Unti
123 lin, ft. 2-member
galvanized steel hand vail
Unit Price 720 /lin. ft.
i t}Pee LO Cate
Work (continued)
Total
Total
coximately 2, 2,565: ‘sq. EG.
“Total
‘Total
| Awow
Ouax)
a
listed below)
Total Cost $ 2./23.00
Cost $ 2450.00
1560.90
Cost $ ;
4, 20
Total Cost $ /
Total Cost $ Seay
pects
Gost Sf 7/6. 00
Cost 6. 3 se 50
650.00
Total
Total Cost $
Cost.$_ 2. 0.3.47
Cost $ J3 5,00
t Total Cost $_ 8 G/.00
Total Cos ft ¢: 4 fe. CO
PROPOSAL
/
Mek at bf
{ j
p Ae AdOg: Ado:
ous} \ousx| (ousx: lause,
: “ f . . “oF a as -
PARK CONSTRUCTION + THOMASVILLE PARK
BIDS SUBMITTED TO TNCLUDE (Break bids down as listed below)
. &, Cost for Asphalt Paving
(a) Avoproximately 2,110 sq. yds. ..
Drive and Perkirg
Unit Price 220 /sq. yd. Total Cost as 4642, 06 00°
Bh (b) Approximately 1,740 sq. yds.
: Tennis & EST UR Courts Paving oS
Unit Price 2.70 _/sq. yd. Total Cost $ 4 628.00
(c) Painting Lines (Parking . '
Tennis & Multi-use Courts) Total Cost ‘$ 330, OO
(d) 4& Tennis Net Posts. (Tennis Courts)
Unit Price _7400/post Total Cost $ 140.00
(e) Asphalt Swale at lower end |
of Tennis Courts | : m - Total Cost $ LE «OR
9% Pxrefabricated Steel Building Gcnlece
“Total Cost $ 1072.50 :
feo
Concrete Floor Slab £or.. Steel
Building - Approximately 96
sq. “EE. “Conerete Floor Slab
_Unit Price 777 /sq. ft. ° Total, Cost. $ JO5..60
i 10. Sprigging Area | . ee
Approximately 106 200 Se ft. ara}
Sprigging ;
Unit Price _0.07/sq.° ft. Total Cost $_ 7 F3
| > pee roximately —300— 500. one yde"
@ 440 eu. Fae... . Total Cost C2 Lo £0. OO
.i, LUMP suM FOR JOB COMPLETE $ (54. Z2E2. SJ >»
aa
Se ah —
» 08 bids aoe and the work nay be ihevaased or decreased up
to 50% of the total aggregate bid without entitling the Contrac=.
z nay claim for extra pay because of any damage he may
. SUStain on account of such increase or decrease and such addi- ©
tion ox ceduction may be made to only one item or may be
Gistreibuted over the entire bid.
C
oO
i
rt
+O
"
MS
PROPOSAL 6.
Comments